Hydel Power - Industry – Focus

 

Custom Search

Himachal Hydel Projects

Dharmshala Hydro Power to set up 4.5 MW Mauhji hydro electric project

Project Location : Khanyara Village, Kangra District,, Himachal Pradesh
Project Capacity : 4.5 MW

Dharmshala Hydro Power to set up 4.5 MW Mauhji hydro electric project in village Khanyara in Kangra district of Himachal Pradesh. The project involves setting up of a run-of-the river small hydropower project planned on the Maujhi Khad, a small tributary of river Beas, draining in the Kangra District. It will harness the head available in its reach between Thatri and Khanyara, two villages located in Kangra district near Dharmshala.The powerhouse comprises two synchronous generators of a capacity 2250 KW coupled to two Pelton turbines. The generated voltage at the generator terminals will be 11 kV, which will be stepped-up to 33 kV to match the nearest substation voltage level. The project is expected to export around 20.0 million units every year to HPSEB and had been commissioned in 2004

Latest News

Contact Address :
Dharmshala Hydro Power Ltd Corp Office: Plot No. 30-A, Road No. 1, Film Nagar Jubilee Hills,
Hyderabad- 500034 2355 3459 2355 3462 This email address is being protected from spambots. You need JavaScript enabled to view it.

Astha Projects to set up 5 MW Dehar hydro electric project

Project Location : Bithal village, Chamba district, Himachal Pradesh
Project Capacity : 5 MW

Astha Projects had set up 5 MW Dehar hydro electric project in village Dehar in Chamba district of Himachal Pradesh. The project run-of-the river small hydroelectric scheme proposed on Dehar Khad, a tributary of Gaj Khad which joins river Beas on the right bank in Sihunte Taluk. The head works for the proposed project comprise diversion and intake structures located near Gurgu village. The power channel, desilting tank, forebay, penstock, and powerhouse are located on the left bank of the Dehar Khad. The powerhouse and outdoor switchyard are proposed near the village Bithal.The powerhouse comprises two numbers synchronous generators of a capacity 2500 KW each coupled to two Pelton turbines. The generated voltage at the generator terminals will be 6.6 KV, which will be stepped-up to 33 KV to match the nearest substation voltage level. The project is expected to export around 24.87 million units to HPSEB. The project had been commissioned in 2004

Latest News

Contact Address :
Astha Projects (India) Ltd Corp Office: 8-2-704/B/15, Plot No. 14, Sai Enclave Road No. 12, Banjara Hills,
Hyderabad- 500034 2337 5910 2337 5908 This email address is being protected from spambots. You need JavaScript enabled to view it.

Cosmos Consulting had set up 9 MW Frozal 9 MW Hydro Electric Project

Project Location : Dobi Village, Kullu District, Himachal Pradesh
Project Capacity : 9 MW

Cosmos Consulting had set up 9 MW Frozal Hydro Electric Project in village Dobi in Kullu district of Himachal Pradesh. The project which is a run-off-the-river scheme on the lower course of Frozal stream during high season with a head of 141 meter with a turbine capacity of 9 MW. The project had been completed in 2006

Latest News

Contact Address :
Cosmos Consulting Corp Office: N-79, Panchsheel Park
New Delhi- 110017 2649 0350 2649 1910 This email address is being protected from spambots. You need JavaScript enabled to view it.

Custom Search

Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202   Mobile : 0-97898-37940 email : [email protected] Privacy Policy