Assam Power Generation Corp plans 96 MW Lower Kopili hydro electric project in the downstream of Kopili HEP Stage-I Power House. The project involves construction of 70.13 metre high concrete dam, 7.25 m dia, 3.622 m long Head Race Tunne, a surge shaft, a surface power house with installed capacity of 110 MW (2 x 55 MW), an auxiliary power house of 10 MW to utilize the ecological releases.
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy