- Details
-
Category: Uttaranchal Hydel Projects
GVK power is planning to set up Bogudiyar-Sirkari Bhyol HEP 170 MW ( 2 x 85 MW) units in Pittogarh district of Uttarkhand state. The project involves setting up of a 98 m concrete gravity dam across river Goriganga tributary of river Kali (Sarda). The dam site to be located near Bogudiyar Village at the right bank of Goriganga River. This is a run-off-the-river scheme. The total land requirement for the project is 75 ha. An underground power house is to be located upstream of the confluence of Jaulchhida Gad on the right bank of the river with 2 units of 85 MW each. The total cost of the project is Rs.8592.7 million and is likely to be completed in 5.5 years.