Hydel Power - Industry – Focus

 

Custom Search

Sai Engineering Foundation to set up 5 MW Toss hydro electric project

Project Location : Toss, Kullu district, Himachal Pradesh
Project Capacity : 5 MW

Sai Engineering Foundation to set up 5 MW Toss hydro electric project in Toss village in Kullu district of Himachal Pradesh. The project involves setting up of run-of-the river scheme and involves construction of a trench type diversion weir, intake chamber, desilting chamber, power channel in the form of an underground free-flow un-pressurized tunnel, fore bay, penstocks with saddles, anchor blocks and the power station with the tailrace for discharging the water back into the river. The project comprises two identical power-generating units of capacity 2500 kW each (Pelton turbine ). Power will be generated at a lower voltage level, which will be stepped up to higher voltage level within in the project boundary to facilitate export of power to

Latest News

Contact Address :
Sai Engineering Foundation Corp Office: SAI Bhawan
New Shimla- 171009

Custom Search

Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202   Mobile : 0-97898-37940 email : [email protected] Privacy Policy