- Details
-
Category: Himachal Hydel Projects
Indo Arya Central Transport Co, a logistics provider is setting up a 36 MW hydel project at Chanju nalla, a tributary of river Ravi, in Chamba district of Himachal Pradesh. The project involves installation of 3 verical axis Francis turbine of 12 MW each utilizing a design head of 236 meters. The generated power will be evacuated to NEWNE grid at a sub-station at Kurthala. The project involves construction of 54 meter wide gated weir, a 5376.5 meter pressure flow head race tunnel, 2.3 dia penstock and a 132 KV DC line from Kurthala to Baithri for evacuation of power. This hydel project is expected to be commissioned by September 2012