Kerala State Electricity Board to set up Athirappally hydroelectric project(163 MW) located in Chalakudy river basin in Thrissur district of Kerala. The project envisages construction of a reservoir on Chalakudy river with 23m high gravity dam located at 3 km. downstream of the existing Poringalkuthue left bank power house. A surface power house on the left bank of Kannankuzhy Thodu 2 Kms. upstream of its confluence with Chalakudy river having an initial installed capacity of 2 units of 80 MW and a dam toe power house with capacity of 3 MW to utilise the water release for maintaining the water falls and rapids.138 ha. forest land involve in the project out of that 123.20 ha. require permanent diversion.
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy