Project Location : Samal, Angul district, Orissa |
Project Capacity : 20 MW |
Orissa Power Consortium to set up 20 MW Samal hydro electric project in Angul district of Orissa. The project involves setting up of a barrage at Samal, about 35 km downstream of the Rengali dam, across river Brahmani. The project has decided to utilize a design discharge flow of 260 m3/sec with 9.85 m design head, which will generate around 102 million units of energy per annum in 90% dependable year with 20MW installed capacityThe powerhouse comprises five numbers of 4000 KW ‘S’ type Kaplan Horizontal turbines coupled with synchronous generators. The generation voltage at the terminals will be 11 KV, which will be stepped up to 132 KV to match the grid voltage level. The power generated will be supplied to West Bengal and a PPC had been signed with Power Trading Corp. The project had been commissioned in 2006
Latest News
Contact Address :
Orissa Power Consortium Ltd Corp Office: 6-2-913/914, 3rd Floor, Progressive Towers, Khairatabad | Hyderabad- 500004 (040) 2331 9122, 2332 0904 to 2332 0908 2332 3830, 2339 0721
This email address is being protected from spambots. You need JavaScript enabled to view it.
| |
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy