Dans Energy to set up 96 MW Jorethang Loop Hydroelectric Project

Project Location : Jorethang, Sikkhim
Project Capacity : 96 MW

Dans Energy to set up the 96 MW Jorethang Loop Hydroelectric Project in Sikkhim. The project involves setting up of a diversion barrage site of 108 meter in length and 13 meter in height in lower reaches of the Rangit river upstream of its confluence with Ramam River, close to the village of Piple.The flow will be directed from the reservoir, through an intake tunnel on the east bank of the river, into a 7.1 km head race tunnel, through a surge shaft and pressure shaft to the powerhouse. The powerhouse will house 2 x 48 MW vertical shaft type Francis turbines, that will be coupled with synchronous generators. The project is progressing well and is scheduled to get commissioned by June 2012

Latest News

The project is progressing well and is scheduled to get commissioned by June 2012

Contact Address :
Dans Energy Pvt Ltd Corp Office: DLF Cyber City, Phase II 5th Floor, Tower C, DLF Building No.8,
Gurgaon- 122002 0124-4693100/ 101 4693111 This email address is being protected from spambots. You need JavaScript enabled to view it.

Custom Search

Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202   Mobile : 0-97898-37940 email : [email protected] Privacy Policy