Project Location : Kundapura, Udupi district, Karnataka |
Project Capacity : 2 MW |
Sandur Power Co to set up Varahi HEP in Kundapura in Udupi district in Karnataka. The project activity contemplates utilization of tail race water of Varahi Underground Power Hooouse Station. Project has short weir across river Varahi, Head Race Tunnel, penstock tunnel, anf vertical shaft full Kaplan Turbine with adjustable guide vanes and adjustable runner blades. The project had been commissioned in
Latest News
Contact Address :
Sandur Power Co Ltd Corp Office: 16th Cross, 14th Main, IV Sector, H.S.R. Layour H. No. 84, | Bangalore- 560034 25729601, 25729602 25729603
This email address is being protected from spambots. You need JavaScript enabled to view it.
| |
Project Location : Chunchi Doddi, Bangalore Rural, Karnataka |
Project Capacity : |
Sai Spurthi Power to set up 10.25 hydro electric project in village Chunchi Doddi in Kanakapura Taluka in Bangalor Rural district of Karnataka. The project involves setting up of a run-of-the river hydroelectric scheme proposed on the right bank the Arkavati river. The project design comprises a diversion structure, power canal, penstock, powerhouse, switch yard, tail race and tail race canal. Project powerhouse comprises 3 generating units, two identical units having 4.5 MW capacity and third having 1.25 MW capacity. The project had been completed in 2006
Latest News
Contact Address :
Sai Spurthi Power Pvt Ltd Corp Office: No. 648, 32nd Cross, 22nd Main, 4th ‘T’ Block Jayanagar | Bangalore- 560042 26541188 26551821
This email address is being protected from spambots. You need JavaScript enabled to view it.
| |
Project Location : Somanamaradi, Raichur district, |
Project Capacity : 6 MW |
Narayanpur Power Co to set up 6 MW hydro project in village Somanamaradi in Deodurga Taluk in Raichur district in Karnataka. The project involves utilizing the hydro potential exists with “Narayanapur Right Bank Canal” with a head drop of 30 meters The project design comprises a diversion structure, power canal, penstocks, powerhouse, power evacuation system and tailrace canal. No storage facility such as dam is involved and hence, the power will be generated whenever water flow is available in the irrigation canal. The project had been completed in 2004
Latest News
Contact Address :
Narayanpur Power Co Pvt Ltd Corp Office: Bharat Apartments, Ground Floor, #44, Race Course Road, | Bangalore- 560028 2337 6630/31 2332 2517 | |
Project Location : Chayadevi, Raichur, |
Project Capacity : 24 MW |
Bhoruka Power Corporation to set up the 24 MW hydro electric project in Raichur district in Karnataka. The project involves setting up of run-off-the-river across river Chayadevi which utilizes the available head of 29m with a discharge of 100 m3/s and will have two penstocks of short length from the intake structure leading to the power house which has two turbine units (vertical kaplan) of 12 MW. The project had been commissioned in 2006
Latest News
Contact Address :
Bhoruka Power Corporation Ltd Corp Office: # 48, Lavelle Road, | Bangalore- 560001 22245246/22272271-76 22245246,
This email address is being protected from spambots. You need JavaScript enabled to view it.
| |
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy