Himachal Hydel Projects

Tata and S N Power to set up 236 MW Dugar Hydro electric project

Tata Power and S N Power Norway has bagged the contract to set up the 236 MW hydro power project across Chenab (Chandrabanga). It has been awarded the contract from Directorate of Energy, Government of Himachal Pradesh. The dam height will be 93 meters and the powerhouse will be constructed underground. It will be built across the last cascade of the river. The project cost is estimated at Rs. 23,000 million.

Sai Engineering Foundation to set up 5 MW Toss hydro electric project

Project Location : Toss, Kullu district, Himachal Pradesh
Project Capacity : 5 MW

Sai Engineering Foundation to set up 5 MW Toss hydro electric project in Toss village in Kullu district of Himachal Pradesh. The project involves setting up of run-of-the river scheme and involves construction of a trench type diversion weir, intake chamber, desilting chamber, power channel in the form of an underground free-flow un-pressurized tunnel, fore bay, penstocks with saddles, anchor blocks and the power station with the tailrace for discharging the water back into the river. The project comprises two identical power-generating units of capacity 2500 kW each (Pelton turbine ). Power will be generated at a lower voltage level, which will be stepped up to higher voltage level within in the project boundary to facilitate export of power to

Latest News

Contact Address :
Sai Engineering Foundation Corp Office: SAI Bhawan
New Shimla- 171009

Sri Sai Krishna Hydro Energies to set up Luni hydro electric project

Project Location : Deol, Kangra district, Himachal Pradesh
Project Capacity : 10 MW

Sri Sai Krishna Hydro Energies to set up Luni hydro electric project in Deol village in Kangra district in Himachal Pradesh. The project involves setting up of diversion weirs for running Pelton Wheel turbines to generate power. The project design consists of construction of a raised drop type trench weir across the stream at elevations, intake chamber, desilting tank, cut and cover type channel, fore bay, penstocks, power house and the tailrace discharging water back into the river. The project had been commissioned in 2007

Latest News

Contact Address :
Sri Sai Krishna Hydro Energies Pvt Ltd Corp Office: Plot No: 226, Road No: 78, Jubilee Hills, Phase III
Hyderabad-

Custom Search

Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202   Mobile : 0-97898-37940 email : [email protected] Privacy Policy